Pilot Building Program (GP Vivienda)

Pilot Building Program (GP Vivienda)
Case Study Description:

As part of our Building Pilot Program Agreement with GP Vivienda, FBR has constructed four Mexican-style two-bedroom, one-bathroom house structures using the Hadrian X® at FBR’s premises, with each structure taking less than one standard shift on average to complete.

Two of the structures were built indoors at FBR’s facility, with the remaining two structures built side by side simultaneously outdoors to emulate the most economical operating process for a Hadrian X® in a residential development in Mexico. 

Having completed the Pilot Program stage, FBR and GP Vivienda intend to progress the Block Development stage of the Building Pilot Program Agreement by building additional Mexican-style structures using the Hadrian X® with blocks produced in Mexico.

Key Facts

View key facts for "Pilot Building Program (GP Vivienda)".

Business Impact

  • Four house structures built
  • Less than 1 shift per structure
  • Simultaneous indoor/outdoor builds

Client Name

Location

Completion Year

Project Type

Tools Used in the Case Study

Discover which tools and technologies were used for "Pilot Building Program (GP Vivienda)".

Hadrian X® by FBR

World's first mobile robotic blocklaying machine and system

Hadrian X® by FBR

User Experience

View user experience for "Pilot Building Program (GP Vivienda)".

Why this tool/tech was selected

GP Vivienda, the housing division of Mexican construction company Grupo GP, entered a Building Pilot Program Agreement with FBR in January 2020 to evaluate whether the Hadrian X® robotic bricklayer could help address Mexico's estimated shortage of more than 8 million well-constructed affordable homes.

The pilot let GP Vivienda test Hadrian X® against its own Mexican-style house designs before committing to a larger rollout, while FBR could refine the machine's performance building two-bedroom, one-bathroom structures under real design constraints. 

Building two structures simultaneously side by side outdoors let the companies emulate the most economical operating conditions for a Hadrian X® deployed at an actual Mexican residential development, informing the Block Development stage that would follow using concrete blocks manufactured in Mexico.

Challenges the Client Faced before

With Mexico facing an estimated shortage of more than 8 million well-constructed affordable homes, GP Vivienda needed a construction method that could scale housing production without sacrificing build quality or consistency.

Robotic bricklaying was largely unproven for GP Vivienda's own Mexican-style house designs, so before committing to a larger deployment the company needed evidence that FBR's Hadrian X® could reliably read its blueprints and lay blocks and bricks to the same standard as manual construction, within a comparable or faster timeframe. 

FBR, in turn, needed to prove the Hadrian X® could operate efficiently under the specific design constraints and materials GP Vivienda intended to use across a residential development in Mexico, rather than only in controlled test conditions in Australia.

The previous method used

Before this pilot, GP Vivienda's affordable housing projects in Mexico were built using conventional manual masonry, with skilled tradespeople laying blocks and bricks by hand on site or in a factory setting, one structure at a time. That approach ties construction speed to the availability and pace of manual labor, making it harder to scale output quickly or guarantee identical build times across projects.

FBR's Hadrian X® offered an automated alternative: a robotic bricklaying system capable of reading a digital design and laying blocks with minimal manual intervention, so the two companies used the pilot to test whether robotic construction could complete comparable house structures faster and more consistently than traditional manual methods.

Time / Money saved & the Business Impact.

By completing four full Mexican-style house structures at less than one standard shift each on average, the pilot gave FBR and GP Vivienda concrete evidence that the Hadrian X® could build to GP Vivienda's own designs at a pace competitive with, or faster than, conventional manual masonry.

Constructing two structures simultaneously side by side outdoors let the companies validate the most economical way to run a Hadrian X® in the field, informing how a future deployment at an actual Mexican residential development might be configured.

Having completed the Pilot Program stage, FBR and GP Vivienda moved into the Block Development stage of their agreement, testing the Hadrian X® with concrete blocks manufactured in Mexico as the companies worked toward a larger-scale rollout.

Customer Quote

-

Ask AI