1 Twin Dolphin Drive

1 Twin Dolphin Drive
Case Study Description:

Complete development of all required documentation during the Entitlements/SD, DD, and CD phases for a Type I, six-story core and shell life sciences building in Redwood City, California. Facade design and optimization for CBC code compliance. The project includes two levels of above-grade tandem and valet parking, as well as a large terrace on Level 3 above the parking structure. At roughly 391,626 square feet, the building was produced entirely by /slantis's architectural documentation team across all three project phases.

Key Facts

View key facts for "1 Twin Dolphin Drive".

Business Impact

  • 391,626 sq ft documented
  • All 3 phases: SD, DD & CD
  • Facade optimized for CBC code

Client Name

Completion Year

Project Type

Tools Used in the Case Study

Discover which tools and technologies were used for "1 Twin Dolphin Drive".

Revit

Autodesk Revit is a Building Information Modeling (BIM) software platform used by architects, engineers, contractors, and AEC teams to design, document, coordinate, and deliver building projects. Unlike traditional CAD software, Revit connects 3D building elements with plans, sections, elevations, schedules, quantities, and project data in one coordinated model. Its key features include parametric modeling, multidisciplinary collaboration, construction documentation, worksharing, visualization, and model-based scheduling. Explore Revit pricing, free trial options, major features, use cases, pros and cons, system compatibility, and the best Revit alternatives to determine whether it is the right BIM software for your workflow.

Revit

/slantis

We team up with busy AEC companies to develop their BIM projects with cutting-edge tech, so they succeed!

/slantis

User Experience

View user experience for "1 Twin Dolphin Drive".

Why this tool/tech was selected

For 1 Twin Dolphin Drive, a roughly 391,626-square-foot Type I life sciences building in Redwood City, California, the project team needed a dedicated production partner to carry a full architectural documentation set through Entitlements/Schematic Design, Design Development, and Construction Documents. /slantis, a production studio built by architects for architects, was brought in to model and document the six-story core-and-shell building in Revit across all three phases.

 

Facade design and optimization for California Building Code compliance was a central part of the scope, alongside detailing two levels of above-grade tandem and valet parking and a large Level 3 terrace built directly above the parking structure. Having a single team carry the documentation from entitlements through construction documents gave the project continuity across phases that can otherwise get lost when different teams pick up a project at each stage.

Challenges the Client Faced before

The building's facade needed to be designed and optimized specifically for California Building Code compliance, a technical requirement that had to be resolved without slowing down the broader documentation schedule across Entitlements/SD, DD, and CD. Getting the facade system right also had downstream effects on other parts of the design, since code-driven changes to the envelope can ripple into structural and parking-level coordination.

 

The project's two levels of above-grade tandem and valet parking, combined with a large terrace on Level 3 sitting directly above the parking structure, added further coordination complexity: the documentation team had to detail a parking structure capable of supporting a usable outdoor terrace above it, while keeping the six-story core-and-shell building's construction documents consistent and code-compliant from entitlements through construction documents.

The previous method used

Before engaging a dedicated production studio like /slantis, a project of this scope and complexity would typically have required an in-house team to carry the full Revit documentation set through Entitlements/SD, DD, and CD internally, or to bring on additional staff for the duration of the project. For a Type I core-and-shell life sciences building with a demanding facade compliance scope and a multi-level parking structure, that kind of internal staffing approach can strain a firm's capacity, particularly if the architecture team is already carrying other active projects.

 

Coordinating facade optimization for CBC compliance alongside parking and terrace detailing across three separate phases, using only in-house resources, would also mean the same core team absorbing the full workload of iterative code review and redesign, rather than having a dedicated production partner focused specifically on carrying that documentation forward.

Time / Money saved & the Business Impact.

Carrying 1 Twin Dolphin Drive's documentation through Entitlements/Schematic Design, Design Development, and Construction Documents with a single dedicated production team gave the project continuity that can be hard to maintain when documentation responsibilities shift between different people or teams at each phase. For a roughly 391,626-square-foot Type I life sciences building, that continuity mattered particularly for the facade system, where optimization decisions made for California Building Code compliance needed to carry through consistently from early design into final construction documents.

 

The same production team also detailed the project's two levels of above-grade tandem and valet parking and the Level 3 terrace built above that parking structure, so the structural and code-compliance implications of the facade work stayed coordinated with the parking and terrace design rather than being resolved separately by different teams at each phase.

Customer Quote

-