Case Study Description:

The Grand LA is a major mixed-use development in downtown Los Angeles' Grand Avenue Arts Corridor, designed by Frank Gehry for developer Related Companies. Sitting across from Gehry's Walt Disney Concert Hall, the project includes The Grand by Gehry, a 45-story, 436-unit luxury residential tower; the Conrad Los Angeles, a 28-story, 305-room hotel that marked Conrad Hotels & Resorts' first California property; and roughly 164,000 square feet of retail, dining, and entertainment space. Structural engineer DCI Engineers used Visicon to manage the development's complex building information models, combining three separate structural Revit models with three corresponding architectural models from Gehry Partners. Each floor has a distinct layout, with irregular slab edges and shifting column and transfer beam placements that made model coordination especially demanding across the project's residential, hospitality, and retail components.

Key Facts

View key facts for "The Grand LA".

Business Impact

  • Models load in seconds, not minutes
  • File size cut to under 1/10 original
  • Rapid Visicon adoption firmwide

Client Name

Completion Year

Tools Used in the Case Study

Discover which tools and technologies were used for "The Grand LA".

Visicon

Model viewer to understand, compare, and check BIM models

Visicon

User Experience

View user experience for "The Grand LA".

Why this tool/tech was selected

DCI Engineers turned to Visicon to solve a coordination problem specific to The Grand LA's scale and geometry. With Frank Gehry's design spanning a 45-story residential tower, a 28-story hotel, and a large retail podium, each floor had its own unique layout, and the project's slab edges, columns, and transfer beams shifted shape and position from level to level. Reviewing that complexity meant working across three separate structural Revit models and their three corresponding architectural counterparts from Gehry Partners, models that were heavy, slow to open, and cumbersome to reference on a daily basis. Visicon let DCI's team combine and overlay all six models, generating custom views to study system geometry and support faster, more collaborative design decisions across the whole engineering group.

Challenges the Client Faced before

The Grand LA's Gehry-designed geometry created unusual structural coordination demands. Each floor had a distinct layout, so column placement and transfer beam locations changed from level to level rather than following a repeatable grid, and slab edges throughout the building took unconventional, non-standard shapes. Reconciling this complexity meant working across three separate structural Revit models built up against three architectural models from Gehry Partners, all of which needed to be compared and cross-checked throughout design and construction.

The previous method used

Before adopting Visicon, DCI's engineers worked directly with the project's native, uncombined Revit models, a method the firm's own team described as spending more time than necessary just accessing and referencing project information. With six separate architectural and structural models to track across The Grand LA's residential, hotel, and retail components, opening and cross-referencing files was slow and interrupted the engineering team's daily workflow.

Time / Money saved & the Business Impact.

Adopting Visicon gave DCI Engineers' team on The Grand LA dramatically lighter, faster project files: combined models that once took considerable time to open and navigate were compressed to less than one-tenth of their original size and could be opened within seconds. That speed let engineers move quickly between the six architectural and structural models without losing time to loading or searching, supporting more responsive collaboration on a project defined by shifting floor plates and irregular geometry. The results were compelling enough that Visicon adoption spread rapidly across DCI beyond this single project, and the firm's own team reflected that the tool would have been valuable from the project's earliest years, with DCI project manager Patrick Lindblom noting he wished the firm had Visicon when the six-year project began.

Customer Quote

"I wish we would have had Visicon around when we began this project 6 years ago." - Patrick Lindblom, Project Manager, DCI Engineers